Bathroom Renovation Budget Guide
Plan and budget for your bathroom renovation with realistic Ontario cost estimates and hiring tips.
What This Video Covers
- Realistic bathroom renovation costs broken down by category
- Materials comparison at different budget levels
- Waterproofing essentials — what not to skip
- Timeline expectations and how to plan around one-bathroom living
Safety Warnings
- All plumbing and electrical work must be done by licensed tradespeople. Bathroom electrical must be GFCI protected.
- Ensure proper ventilation. A bathroom fan (minimum 50 CFM) vented to the exterior is code-required in Ontario. Poor ventilation causes mould.
- If your home is pre-1990, test for asbestos in floor tiles, plaster walls, and pipe insulation before demolition.
Step-by-Step Guide
Determine your renovation scope
A cosmetic refresh (paint, fixtures, accessories) costs $2,000-$5,000. A mid-range renovation (new vanity, tub, tile) runs $8,000-$18,000. A full gut renovation with layout changes costs $18,000-$35,000+.
Decide what stays and what goes
Keeping existing plumbing in place saves thousands. Moving a toilet, shower, or sink requires new plumbing rough-ins which dramatically increases cost. Work with your existing layout when possible.
Choose materials at different price points
Tiles: porcelain ($3-$8/sq ft) vs natural stone ($15-$30/sq ft). Vanities: prefab ($200-$800) vs custom ($1,500-$5,000). Fixtures: standard ($50-$200) vs premium ($300-$1,000+). Mix high and low strategically.
Hire a verified bathroom renovation contractor
Search ProScore for bathroom remodeling contractors with strong scores. For full renovations, look for HCRA-verified contractors. A dedicated bathroom contractor will cost more than a handyman but delivers significantly better results.
Understand hidden costs
Budget for: permits ($200-$500), plumbing rough-in changes ($1,500-$3,000), electrical updates ($500-$1,500), waterproofing ($500-$1,000), and unexpected issues behind walls (10% contingency).
Plan the timeline
A typical bathroom renovation takes 3-6 weeks. Demolition: 1-2 days. Plumbing/electrical rough-in: 2-3 days. Waterproofing: 1-2 days. Tile: 3-5 days. Fixtures and finishing: 2-3 days. Allow buffer for material delays.
Waterproofing is non-negotiable
Proper waterproofing in the shower and tub area prevents mould and structural damage. Ensure your contractor uses a membrane system (Schluter Kerdi or RedGard). This is not where you cut corners.
Rather hire a pro?
Find a trusted bathroom remodeling near you, verified across 15+ data sources with a ProScore rating you can trust.
Find a Verified Pro
Compare bathroom remodeling rated across 15+ verified data sources.
Browse Bathroom RemodelingWhat You'll Need
Prices are estimates in CAD. Links may contain affiliate partnerships.
Difficulty Level
Requires some research and planning. Consider hiring a pro for complex aspects.
Cost Guide
See what Ontario homeowners pay for bathroom remodeling services in 2026, with price breakdowns by service type.
View Bathroom Remodeling CostsAI Project Matching
Answer 4 quick questions and ProScore Intelligence matches you with the 3 best contractors for your specific project.
Find My Perfect Match